Guralp Systems Limited
MAN-030-0001 - Güralp 3T Operator's guide

Previous

1. Preliminary Notes 2. Introduction 3. Installing the 3T 4. Calibrating the 3T 5. Accessories 6. Inside the 3T 7. Connector pin-outs 8. Specifications 9. Revision history

Chapter 9. Revision history

2016-06-30

R

Specifications aligned with data-sheet. Images updated. New branding.

2015-07-25

P

Corrected 1500psi connector pin-out. Updated SoH description.

2010-02-26

O

New diagrams and improved connector information

2009-07-06

N

Added integrated SOH controller

2006-10-19

M

Added waterproof connector pin-out

2006-08-14

L

Added RS232 command interface

2006-06-06

K

Moved BB to “Accessories”

2006-02-20

J

Corrections; added revision history

2004-10-29

H

New document

Previous

1. Preliminary Notes 2. Introduction 3. Installing the 3T 4. Calibrating the 3T 5. Accessories 6. Inside the 3T 7. Connector pin-outs 8. Specifications 9. Revision history