Guralp Systems Limited
MAN-BHO-0001 Güralp 3TB Operator's Guide

Previous

1. Preliminary Notes 2. Introduction 3. First encounters 4. Installing the 3TB in a borehole 5. Calibrating the 3TB 6. Inside the 3TB 7. Connector pin-outs 8. Specifications 9. Revision history

Chapter 9. Revision history

2017-11-06

E

Added baffle details

2016-01-02

Face-lift with no significant content changes

2013-04-17

D

Added surge arrestor/stress relief details

2006-11-15

C

Updated Scream! and SOH; added revision history

2005-05-12

B

Original document

Previous

1. Preliminary Notes 2. Introduction 3. First encounters 4. Installing the 3TB in a borehole 5. Calibrating the 3TB 6. Inside the 3TB 7. Connector pin-outs 8. Specifications 9. Revision history