Guralp Systems Limited

PreviousNext

1. Introduction 2. Assembling the instrument 3. Installing the 40TB in a borehole 4. Calibrating the 40TB 5. Connector pinouts 6. Connector pinouts 7. Specifications 8. Revision history

Chapter 5. Connector pinouts

PreviousNext

1. Introduction 2. Assembling the instrument 3. Installing the 40TB in a borehole 4. Calibrating the 40TB 5. Connector pinouts 6. Connector pinouts 7. Specifications 8. Revision history