Guralp Systems Limited

Previous

1. Introduction 2. Assembling the instrument 3. Installing the 40TB in a borehole 4. Calibrating the 40TB 5. Connector pinouts 6. Connector pinouts 7. Specifications 8. Revision history

Chapter 8. Revision history

2006-11-15 C Corrections and clarifications

2006-10-06 B Updated borehole orientation method

2006-03-27 A New document

Previous

1. Introduction 2. Assembling the instrument 3. Installing the 40TB in a borehole 4. Calibrating the 40TB 5. Connector pinouts 6. Connector pinouts 7. Specifications 8. Revision history