Chapter 10. Appendix 2: Recovery check-list

Project/cruise

Instrument Serial No.

Date and time of deployment.

Recovery location (lat, long)

Network code

Station code

Water depth

Name of duty engineer on duty filling out this form

Procedure

Completed?

1

    Navigate to the approximate location of the instrument.

2

    Send the RELEASE command in order to activate the pop-up buoy.

3

    Locate the buoy on the sea surface and bring it on board.

4

    Recover all the excess rope by hand.

5

    Attach the OBS retrieving line to the winch.

6

Move the boat to pull as straight as possible the OBS towards the sea surface.

7

    Connect the GPS to the deck unit and turn the deck unit on.

8

    Connect the deck unit to the OBS.

9

Monitor the status stream until a GPS lock is obtained. Look for a PHASE report and take note of it.

10

    Unscrew the vent port and connect the Firewire disk to the digitiser.

11

    Download the data typing the FLUSH command.

12

    Recharge the batteries before a new deployment.