Guralp Systems Limited
MAN-BHO-0010 - Güralp 40TB SlimLine - Operator's Guide

Previous

1. Preliminary Notes 2. Introduction 3. Assembling the instrument 4. Installing the 40TB in a borehole 5. Calibrating the 40TB 6. Connector pin-outs 7. Specifications 8. Revision history

Chapter 8. Revision history

2016-07-19

Updated to reflect new branding. Re-formatted connector pin-outs. No significant changes to content.

2008-10-08

D

Updated for slimline design and automated centring

2006-11-15

C

Corrections and clarifications

2006-10-06

B

Updated borehole orientation method

2006-03-27

A

New document

Previous

1. Preliminary Notes 2. Introduction 3. Assembling the instrument 4. Installing the 40TB in a borehole 5. Calibrating the 40TB 6. Connector pin-outs 7. Specifications 8. Revision history