Please provide the drilling report or any other hole-logs that are available. Permitable files are: pdf, doc, docx, xls, xlsx (Max 250 KB) *
1.5a Is the borehole wet or dry? *
1.5c Is the fluid in the borehole corrosive? *
1.7a Is the borehole truly vertical? *
2.1 Is the borehole cased? *
2.4a Is the casing diameter consistent through the hole? *
2.7 Is the inside of the casing clean and free of protrusions? *
2.8 Can you provide a copy of a video survey from inside the casing? *
2.11a Has the condition of the casing been measured with a calliper? *
Please provide the calliper report if available. Permitable files are: pdf, doc, docx, xls, xlsx (Max 250 KB) *
2.12a Has the casing been properly cemented into the hole? *
3.1 Does the wellhead... *
Please provide a picture and relevant measurements. Permitable files are: pdf, doc, docx, xls, xlsx (Max 250 KB) *
Please provide a picture or a detailed drawing. Permitable files are: pdf, doc, docx, xls, xlsx (Max 250 KB) *
3.4 Is there a blowout preventer/Christmas tree on the wellhead (see also question 1.6) *
4.1a Is there a concrete pad around the wellhead? *
Please provide pictures or diagrams if you have them. Permitable files are: pdf, doc, docx, xls, xlsx (Max 250 KB) *
4.2 Is there a building or structure around the wellhead? *
If yes, please provide a diagram of the layout. Permitable files are: pdf, doc, docx, xls, xlsx (Max 250 KB) *
Please provide a diagram of the layout Max 250 KB. Permitable files are: pdf, doc, docx, xls, xlsx *
4.5 Can a tripod be installed and used over the wellhead? *
4.6a Is a winch available on site? *
4.7a Is electric power available at the wellhead? *
4.8 Is there protected space to store access cable around the wellhead after installation? *
4.12a Is the general area around the well prone to flooding? *
5.1a Are other scientific instruments (strainmeter, tiltmeter) currently installed in the borehole? *
5.1b If yes, will they stay in the hole while the Guralp sensor is installed? *
5.3 Local Testing. Güralp recommends that before deployment in a remote or difficult to access site, all borehole systems are tested post shipping from the UK to the county of use, but before transporting to the final deployment site. This is to ensure no damage occurred during the unsupervised freight process. Do you have a facility for this local test? *